Assistant General Manager Reports

Assistant General Manager Report (as of April 2019)

To view the current RCSC Management Report (including building & infrastructure information), click here! Beginning in April 2019, the RCSC Board of Directors changed their meeting format and the Board now conducts two meetings each month (typically the second Monday and the last Thursday). Management Reports are now distributed to […]

Read More

Assistant General Manager Report – March 2019

by Chris Herring Building and Infrastructure: Backflow Preventer Installation Multiple golf course and center locations were identified as needing backflow preventers installed. A total of 20 backflow preventers were required and installed. Contractor: Sundland Plumbing (cost – $19,478). Bell Center Approved projects for the Bell Center pool area will require […]

Read More

Assistant General Manager Report – February 2019

by Chris Herring Building and Infrastructure: Flag Poles The three flag poles at 107th Ave and Grand Ave are scheduled for repainting. These flag poles are showing the wear of time. RCSC also supplies the flags that fly on these poles. Contractor: Exquisite Painting (Cost – $3,840). Grand Ave Initial […]

Read More

Assistant General Manager Report – January 2019

by Chris Herring Building and Infrastructure: Grand Ave The Plan of Development (POD) for the Grand Ave project has been approved by Maricopa County. Final civil engineering drawings are anticipated the week of February 4 with permit submission expected the same week. RCSC and the architect have met with each […]

Read More

Assistant General Manager Report – December 2018

by Chris Herring Building and Infrastructure: Bell Center An area at the club mall entrance was closed recently for concrete repair. Concrete slabs had moved creating a tripping hazard. This area had previously been ground down, but continued movement resulted in the need to replace sections of the concrete. Contractor […]

Read More

Assistant General Manager Report – November 2018

by Chris Herring Building and Infrastructure: Grand Ave The Plan of Development (POD) submission is still under review with Maricopa County. Engineers have begun working with ADOT for the planned deceleration lane addition off Grand Ave. Architectural drawings are 80% complete with a round of changes to lighting design being […]

Read More

Assistant General Manager Report – October 2018

by Chris Herring Building and Infrastructure: Grand Ave The Plan of Development (POD) submission has been completed with Maricopa County. This is a high-level review of the site usage plan including building placement, grading and drainage. This multi-month process is required, and approval is a pre-requisite for the development of […]

Read More

Assistant General Manager Report – September 2018

by Chris Herring (presented to the Board by David McClain) Building and Infrastructure: Bell Center Work on the indoor spa at Bell Center is nearing completion. The pebble sheen finish has been completed. The installation of the Rubarock floor covering began on September 20 and is scheduled to be completed […]

Read More

Assistant General Manager Report – August 2018

by Chris Herring Building & Infrastructure Bell Center: Landscape lighting in the pool area at Bell Center was repaired and LED fixtures added to improve the aged landscape lighting in this area. Contractor was Supercharged Electric (Cost – $3,000). Work on the indoor spa at Bell Center is continuing. The […]

Read More

Assistant General Manager Report – July 2018

by Chris Herring Building and Infrastructure Multiple Locations A monsoon storm swept through Sun City on July 9, 2018 with a smaller follow up storm on July 11, 2018. These storms caused various levels of damage across the RCSC centers and golf courses. Considerable time has been spent documenting the […]

Read More