Assistant General Manager Reports

Assistant General Manager Report – October 2018

by Chris Herring Building and Infrastructure: Grand Ave The Plan of Development (POD) submission has been completed with Maricopa County. This is a high-level review of the site usage plan including building placement, grading and drainage. This multi-month process is required, and approval is a pre-requisite for the development of […]

Read More

Assistant General Manager Report – September 2018

by Chris Herring (presented to the Board by David McClain) Building and Infrastructure: Bell Center Work on the indoor spa at Bell Center is nearing completion. The pebble sheen finish has been completed. The installation of the Rubarock floor covering began on September 20 and is scheduled to be completed […]

Read More

Assistant General Manager Report – August 2018

by Chris Herring Building & Infrastructure Bell Center: Landscape lighting in the pool area at Bell Center was repaired and LED fixtures added to improve the aged landscape lighting in this area. Contractor was Supercharged Electric (Cost – $3,000). Work on the indoor spa at Bell Center is continuing. The […]

Read More

Assistant General Manager Report – July 2018

by Chris Herring Building and Infrastructure Multiple Locations A monsoon storm swept through Sun City on July 9, 2018 with a smaller follow up storm on July 11, 2018. These storms caused various levels of damage across the RCSC centers and golf courses. Considerable time has been spent documenting the […]

Read More

Assistant General Manager Report – June 2018

by Chris Herring Building and Infrastructure: Multiple Locations A total of 33 aged HVAC units have been identified for replacement across multiple RCSC buildings in 2018. These replacements will begin over the next week with six units being replaced at Bell, Oakmont and Lakeview Centers. All replacement units will have […]

Read More

Assistant General Manager Report – May 2018

by Chris Herring Building and Infrastructure: Multiple Locations Renovations of the restrooms at several centers are planned for 2018. These include: Lakeview Center 2nd Floor, Lakeview Center Fitness, Sundial Center Clubs and Bell Center Social Hall. We have begun work with an architect to develop the space planning and construction […]

Read More

Assistant General Manager Report – April 2018

by Chris Herring Building and Infrastructure: Bell Center Replacement of the damaged ceiling in the Bell Center indoor spa began on Monday, April 16. Work includes the removal of the existing ceiling, replacement of existing lighting with dimmable LED fixtures, replacement of the ceiling and painting of the ceiling and […]

Read More

Assistant General Manager Report – March 2018

by Chris Herring Building and Infrastructure: Sun Bowl Lighting modifications at the Sun Bowl began March 26, 2018. Lighting will be enhanced with LED floodlights at the rear of the Sun Bowl that will provide additional lighting into and behind the bowl area after shows. Additionally, LED light bollards will […]

Read More

Assistant General Manager Report – February 2018

by Chris Herring Building and Infrastructure: Oakmont Center Fabrication and installation of the cantilever shade structure are awaiting Maricopa County permit approval. Contractor is USA Shade. (Cost – $24,172) Lakeview Center/Lakeview Lanes The renovation of the east restrooms at Lakeview Lanes has been completed and reopened on Saturday, February 17. […]

Read More

Assistant General Manager Report – January 2018

by Chris Herring Building and Infrastructure: Multiple Locations The RCSC WiFi services were originally installed in 2011 with usage growing over time. We are starting the process of upgrading the WiFi services at all RCSC locations (Centers and Snack Shops) which will take approximately 4-6 weeks to complete. These upgrades […]