Assistant General Manager Reports

Assistant General Manager Report — November 2017

by Chris Herring Building and Infrastructure: Oakmont Center A 16’ x 40’ cantilever shade structure is being engineered and will be submitted for permit as soon as some important code questions are answered by Maricopa County Planning and Development and Maricopa County Environmental Services Department. Contractor is USA Shade. (Cost […]

Read More

Assistant General Manager Report – October 2017

by Chris Herring Building and Infrastructure: Oakmont Center A 16’ x 40’ cantilever shade structure is being engineered and will be submitted for permit very soon. The permit submission was delayed due to building setback measurement verification. The new shade structure will be installed on the west end of the […]

Read More

Assistant General Manager Report – September 2017

by Chris Herring Building and Infrastructure: Oakmont Center A 16’ x 40’ cantilever shade structure has been submitted for permits. The new shade structure will be installed on the west end of the Oakmont pool deck. Contractor is USA Shade. (Cost – $24,172) Fairway Center Roof leaks found over the […]

Read More

Assistant General Manager Report – August 2017

by Chris Herring Building and Infrastructure: Oakmont Center A 16’ x 40’ cantilever shade structure will be installed this year on the west end of the Oakmont pool deck. Contractor is USA Shade. (Cost – $24,172) Fairway Center Roof leaks were found in the music room and band equipment storage […]

Read More

Assistant General Manager Report – July 2017

by Chris Herring Building and Infrastructure: Multiple Locations Since an aggressive HVAC (Heating, Ventilation & Air Conditioning) replacement plan was implemented in 2006, RCSC has enjoyed many years of reduced energy costs and minimal summer breakdowns to its 324 unit HVAC and Evaporative cooling equipment plant. Unfortunately, 2017 has been […]

Read More

Assistant General Manager Report – June 2017

by Chris Herring Building and Infrastructure Multiple Location Projects All under solar canopy florescent lamps have been replaced with LED retrofits. The new LED retrofits increase overall lighting, cut lamp maintenance expenses and reduce electrical costs. Contractor was Accel Electric (Cost after rebates – $10,681). Roofing projects reported last month […]

Read More

Assistant General Manager Report – May 2017

by Chris Herring Building and Infrastructure Marinette Center Some roofing repair and re-coating will be done on the Marinette roof. This work is scheduled to be done mid-June 2017. Contractor is Gryphon Roofing (cost – $15,060). Willowcreek / Willowbrook Pro / Maintenance The Willowcreek/Willowbrook/Skilled Trades maintenance building is completed, other […]

Read More

Assistant General Manager Report – April 2017

by Chris Herring Building and Infrastructure Multiple Location Projects All florescent lighting currently under the solar canopies will soon be replaced with LED retrofits. The LED retrofits will provide more light and reduce lamp maintenance. Contractor is Accel Electric (cost after rebates – $10,681). Sundial Center Construction is well underway […]

Read More

Assistant General Manager Report – March 2017

by Jim Wellman General Information Have you noticed that the RCSC has completed several lighting upgrades at its recreation centers clubrooms, restrooms, parking lots, activity areas and the Riverview pro shop? Some lighting installations that really stand out include the Sundial auditorium, Sundial parking lot and various club rooms such […]

Read More

Assistant General Manager Report – February 2017

by Jim Wellman General Information The new Viewpoint Lake boat dock was opened on January 6, 2017. The new dock is outfitted with four paddleboats and two rowboats which are available free of charge to RCSC cardholders. Can you believe that the paddleboats alone were used by 527 cardholders from […]

Read More