by Chris Herring Building and Infrastructure: Oakmont Center A 16’ x 40’ cantilever shade structure will be installed this year on the west end of the Oakmont pool deck. Contractor is USA Shade. (Cost – $24,172) Fairway Center Roof leaks were found in the music room and band equipment storage […]
Assistant General Manager Reports
Assistant General Manager Report – July 2017
by Chris Herring Building and Infrastructure: Multiple Locations Since an aggressive HVAC (Heating, Ventilation & Air Conditioning) replacement plan was implemented in 2006, RCSC has enjoyed many years of reduced energy costs and minimal summer breakdowns to its 324 unit HVAC and Evaporative cooling equipment plant. Unfortunately, 2017 has been […]
Assistant General Manager Report – June 2017
by Chris Herring Building and Infrastructure Multiple Location Projects All under solar canopy florescent lamps have been replaced with LED retrofits. The new LED retrofits increase overall lighting, cut lamp maintenance expenses and reduce electrical costs. Contractor was Accel Electric (Cost after rebates – $10,681). Roofing projects reported last month […]
Assistant General Manager Report – May 2017
by Chris Herring Building and Infrastructure Marinette Center Some roofing repair and re-coating will be done on the Marinette roof. This work is scheduled to be done mid-June 2017. Contractor is Gryphon Roofing (cost – $15,060). Willowcreek / Willowbrook Pro / Maintenance The Willowcreek/Willowbrook/Skilled Trades maintenance building is completed, other […]
Assistant General Manager Report – April 2017
by Chris Herring Building and Infrastructure Multiple Location Projects All florescent lighting currently under the solar canopies will soon be replaced with LED retrofits. The LED retrofits will provide more light and reduce lamp maintenance. Contractor is Accel Electric (cost after rebates – $10,681). Sundial Center Construction is well underway […]
Assistant General Manager Report – March 2017
by Jim Wellman General Information Have you noticed that the RCSC has completed several lighting upgrades at its recreation centers clubrooms, restrooms, parking lots, activity areas and the Riverview pro shop? Some lighting installations that really stand out include the Sundial auditorium, Sundial parking lot and various club rooms such […]
Assistant General Manager Report – February 2017
by Jim Wellman General Information The new Viewpoint Lake boat dock was opened on January 6, 2017. The new dock is outfitted with four paddleboats and two rowboats which are available free of charge to RCSC cardholders. Can you believe that the paddleboats alone were used by 527 cardholders from […]
Assistant General Manager Report – January 2017
by Jim Wellman General Information The four hollow metal doors for on-course restrooms (two at Lakes West and two at Quail Run) have been installed. Contractor was D.H. Pace (cost – $3,961). Sundial Center All Parking lot light poles and fixtures are currently being replaced. The new LED fixtures will […]
Assistant General Manager Report – December 2016
By Jim Wellman General Information Toilets and lavatories at all on-course golf restrooms are now replaced. Roofing contractor was DFG Builders (cost $24,104); painting by Exquisite Painting; lavatories and toilets completed by the RCSC Skilled Trades plumber (cost – $24,857). The four doors (two at Lakes West and two at […]
Assistant General Manager Report – November 2016
By Jim Wellman General Information Toilets and lavatories continue to be replaced at all on-course golf restrooms. Remaining locations for toilets and lavatories are as follows: four at Lakes East and four at Willowbrook. The RCSC plumber is committed to completing these locations in November 2016. Roofing Contractor was […]