Building and Infrastructure:

Multiple Locations

  • Since an aggressive HVAC (Heating, Ventilation & Air Conditioning) replacement plan was implemented in 2006, RCSC has enjoyed many years of reduced energy costs and minimal summer breakdowns to its 324 unit HVAC and Evaporative cooling equipment plant. Unfortunately, 2017 has been the exception with three (3) HVAC units replaced and ten (10) failures requiring repairs in the month of July alone.

Sun Bowl Ballfield

  • The installation of the new softball scoreboard was completed a few weeks ago and is being enjoyed by ballplayers and fans alike. (Please note that additional costs associated with sign upgrades were paid by the Softball Club.) Contractors were Bootz & Duke Signs and Accel Electric. (RCSC Cost-$5,632)

Mt. View Center

  • The touchscreen control cabinet on the swimming pool ultra violet system was replaced due to electronic failures. Contractor was Aquatic Environmental Systems. (Cost – $9,422)

North Maintenance / Cart Barn

  • The North Cart Barn roof has been cleaned and recoated. The contractor will be installing new coping and fixing a few punch list items soon. Contractor is Gryphon Roofing. (Cost – $7,019)

Sundial Center / Lakes E/W Snack Shop / Talisman Hall

  • The four auditorium restrooms off the lobby hallway are being remodeled. The project is now started with partial demolition completed and floor tile and mastic removal underway. This restroom project includes the demolition of all wall and ceiling drywall and repairs/replacement of electrical and/or plumbing rough-in items. Missing or damaged insulation will be replaced followed by installation of drywall on all walls and ceilings. The restrooms will then be topped off with new LED lighting, quartz vanity tops, toilet and urinal partitions, toilets, urinals, lavatories and faucets, flooring, wall tile and a complete painting. Contractor is Ken McIntyre Construction and Accel Electric. (Cost – $142,041)
  • Preparations are underway to remodel the Sundial kitchen off the East hall. This project will include the disposal of all appliances, demolition of all wall and ceiling board, new electrical wiring, replacement of the underground sink drain line, new cold & hot water piping, replacement of missing or damaged insulation, installation of drywall on all walls and ceilings, cabinetry (including lockable club storage lockers), new LED lighting, painting, new quartz counter tops and back-splashes, new kitchen sink, hand washing sink, new faucets, new appliances (two warming drawers, refrigerator/freezer and microwave), established areas for the ice machine and serving carts and new flooring with coved baseboards. Contractors include the RCSC Skilled Trades cabinetmakers, Ken McIntyre Construction, CCBG Architectural, Olympic Fire Protection, Accel Electric, Sunland Plumbing, Lee’s Counter Tops, Resource Flooring, JRM Environmental and Spray Systems Environmental. (Cost – $66,575)
  • Sundial Mini Golf roof repair and re-coating has been completed with only a few minor punch list items remaining. Contractor is Gryphon Roofing. (Cost – $9,923)
  • The Lakes East/West Snack Shop and Talisman Hall Roof has been cleaned and recoated. A few punch list items still remain. This contractor will also be replacing some roof shingles which blew off in the windstorm of July 15. Contractor will be Starkweather Roofing. (Cost – $17,168)
  • The Sundial Men’s Club room received a complete interior painting and new 6” rubber baseboards in all rooms. Contractor was Exquisite Painting. (Cost – $7,130)

Bell Center

  • Bell Social Hall roof was cleaned and all punctures and pipe penetrations have now been sealed. Since this roof is a cementitious sprayed on type roof, it cannot be recoated; however, with the completion of these repairs RCSC should enjoy another 3 to 5 years before a full replacement is necessary. Contractor is Tremco, Inc. (Cost – $12,660)
  • The touchscreen control cabinet on the walking pool ultra violet system was replaced due to electronic failures. Contractor was Aquatic Environmental Systems. (Cost – $9,390)

Marinette Center

  • Repair and re-coating has been completed on the Marinette roof with only a few punch list items remaining. Contractor is Gryphon Roofing. (Cost – $15,060)

Comments are closed